Skip to content

Data Center & AI Infrastructure Electrical Contractor Power That
Can't Go Down.

Ohm Grown is the electrical contractor that builds the power foundation data centers and AI facilities run on, across Tampa Bay, Florida, and nationwide: utility service and switchgear, generator and ATS tie-ins, UPS systems, busway and PDUs, high-density rack power, power for liquid cooling, grounding and bonding, and the conduit and duct-bank pathways your network trades build on. One licensed crew, accountable from the utility to the cabinet.

(813) 778-5992
  • 01 Switchgear
  • 02 Generator / ATS
  • 03 UPS
  • 04 Busway & PDU
  • 05 High-Density Racks
  • 06 Duct Banks

Why It Matters

In a data center, a sloppy termination isn't a punch-list item. It's an outage, a breached SLA, and a phone call nobody wants to make. We plan every task near energized equipment with a written method of procedure, work inside your change windows, and leave documentation your facilities team can actually use.

Capabilities

Mission-Critical Scope

FL Electrical Contractor #EC13014766 · ISN Certified · OSHA 10 / 30 crews

  • 01

    Service, Switchgear & Distribution

    Service entrance, main switchboards from 400A to 4000A, distribution panels, and 480V / 208V distribution built to the engineer of record's design. Utility coordination with TECO handled.

  • 02

    Generator, ATS & Standby Power

    Generator connections, automatic transfer switches, and emergency, legally required, and optional standby circuits per NEC Articles 700, 701, and 702. Load bank testing support at commissioning.

  • 03

    UPS & Battery Systems

    UPS input, output, and maintenance bypass wiring, battery cabinet and string connections, coordinated with the manufacturer's start-up technicians.

  • 04

    Busway, PDUs & RPPs

    Overhead busway, floor PDUs, remote power panels, and rack whips: labeled, torqued to spec, and with A and B feeds kept genuinely separate.

  • 05

    AI & High-Density Rack Power

    Higher-capacity feeders, busway taps, and branch circuits for GPU and AI racks, with the panel and distribution capacity dense rows demand, built to the design you have and sized for the next refresh.

  • 06

    Liquid Cooling & Mechanical Power

    Power for coolant distribution units (CDUs), chillers, CRAC / CRAH and in-row cooling, and pumps, plus emergency power-off circuits and NEC Article 645 IT-room provisions.

  • 07

    Grounding & Bonding

    Grounding electrode systems, equipment grounding, rack and ladder-tray bonding, and telecommunications grounding busbars per NEC Article 250 and ANSI/TIA-607.

  • 08

    Conduit & Groundwork for Fiber Teams

    We run the conduit, duct banks, sleeves, cable tray, and pull boxes your fiber and low-voltage contractors need, installed and bonded on schedule. They pull and terminate the cable; we make sure the path is ready.

The Power Path

From the Utility
to the Rack.

  1. 01 /

    Service & Distribution

    Utility service, transformer, and main switchboard: sized to the load, coordinated with the utility, inspected the first time.

  2. 02 /

    Backup & Conditioning

    Generator, automatic transfer switch, and UPS installed and commissioned so a utility event never reaches the floor.

  3. 03 /

    Power to the Rack

    PDUs, busway, and branch circuits to every cabinet, sized for today's load and the high-density racks coming next.

UTILITY · 13.2 kVXFMR · 480Y/277VMAIN SWBDGATSUPSGENBATTPDUCONDUIT · TRAYRACK A–C
Illustrative single-line diagram

Scope of Work

We Lay the Groundwork.
Your Fiber & Low-Voltage Teams Build On It.

On data center, commercial, and venue projects, Ohm Grown runs the conduit and installs the groundwork your fiber and low-voltage contractors need, sized and scheduled with them up front, so their crews arrive to finished pathways and live power.

Ohm Grown Installs

  • Conduit, sleeves, and core drills
  • Underground duct banks, handholes, and directional boring
  • Cable tray, ladder rack, and J-hook pathways, installed and bonded
  • Pull boxes and pull strings in every run
  • Power circuits for network racks, MDF / IDF rooms, and PoE switches
  • Telecom grounding busbars and bonding

Your Fiber & Low-Voltage Contractor Installs

  • Fiber optic cable, splicing, and termination
  • Structured (copper) data cabling
  • Access control, cameras, and security systems
  • AV, audio, and display signal cabling
  • Network equipment, testing, and certification

Ohm Grown does not install fiber, network cabling, or low-voltage systems. We build the pathways and power for the contractors who do.

How We Run It

Five Steps.
No Surprises.

  1. STEP 01

    Walk & Review

    Site walk, drawing review, and a load and redundancy check (N, N+1, or 2N, as designed) before we price anything.

  2. STEP 02

    Method of Procedure

    Written MOPs for any work near live systems, approved by your team and scheduled inside your change windows.

  3. STEP 03

    Install

    Licensed crews, labeled and torqued terminations, clean conductor dress, and separated A / B paths.

  4. STEP 04

    Test & Commission

    Insulation resistance, torque verification, and phase rotation checks, plus support for load bank and integrated systems testing.

  5. STEP 05

    Document & Hand Off

    As-builts, panel schedules, labeling, and test results your facilities team can use on day one.

Codes & Standards

Built to the Book.

NFPA 70 (NEC)
Including Art. 250, 645, 700–702, and 708
NFPA 70E
Electrical safety in the workplace
NFPA 75
Fire protection of IT equipment
ANSI/TIA-942
Data center infrastructure (electrical topology)
ANSI/TIA-607
Grounding and bonding
Florida Building Code
Plus local AHJ amendments

Proof

Earned in the Field.

  • 01

    Mission-Critical Venues

    Distribution panels, conduit, and scoreboard and display power rebuilt at Tropicana Field after Hurricanes Helene and Milton, on an MLB timeline.

  • 02

    ISN / ISNetworld Certified

    The enterprise prequalification Fortune 500 facilities use to vet contractors before they set foot on site.

  • 03

    TECO Approved Subcontractor

    Approved by Tampa Electric, so utility coordination on service work moves without a learning curve.

FAQ

Straight
Answers.

Do you work inside operating data centers?

Yes, with planning. Work near energized systems runs from a written method of procedure (MOP) your facilities team approves, scheduled inside your change-management windows. Where the scope allows, we de-energize and verify before work begins, following NFPA 70E.

Can you support AI and high-density racks?

Yes. We install the higher-capacity feeders, busway, and branch circuits that high-density and GPU racks need, and the power for liquid-cooling equipment such as CDUs, built to the engineer of record’s design.

Do you install fiber or network cabling?

No. Fiber and network cabling are not part of our services. We run the conduit and install the groundwork your fiber and low-voltage contractor needs: duct banks, sleeves, cable tray, pull boxes and pull strings, grounding, and power for the network racks. They pull, splice, and terminate the cable, and we coordinate the schedule so the pathways are ready when they arrive.

What kinds of data center projects do you take on?

Server rooms, edge and colocation suites, white-space expansions, AI and high-density deployments, UPS and generator upgrades, and electrical scopes within larger new builds working under your general contractor.

Do you coordinate with the utility?

Yes. We are an approved TECO subcontractor and handle utility coordination for new and upgraded services, from load letters to the service cut-over.

What documentation do we get at turnover?

As-built drawings, panel schedules, circuit and equipment labeling, and test results for the work we installed, organized for your facilities team.

Will you travel for a data center project outside Florida?

Yes. Data center and AI infrastructure work is where we travel most. We mobilize our own foremen and electricians, handle travel and lodging, and confirm the license and permit path for the state and jurisdiction before we mobilize. Home base is Tampa Bay, with crews daily across Hillsborough, Pinellas, Pasco, Polk, Manatee, Sarasota, and Hernando counties.

Service Area

  • Tampa
  • Brandon
  • Riverview
  • Plant City
  • St. Petersburg
  • Clearwater
  • Largo
  • Wesley Chapel
  • New Port Richey
  • Zephyrhills
  • Lakeland
  • Winter Haven
  • Auburndale
  • Bradenton
  • Palmetto
  • Sarasota
  • Venice
  • North Port
  • Brooksville
  • Spring Hill

Florida-based, with travel crews for Georgia, Alabama, South Carolina, North Carolina, Tennessee, Virginia, Texas, Arizona, Nevada, and beyond. Service areas & travel →

Next Service

Commercial Electrical & Tenant Build-Outs

Planning a Data Center or AI Build?

Send us the drawings. We'll walk the site, review the redundancy design, and come back with a clear scope, schedule, and number.

(813) 778-5992

Connect With Us

We respond within one business day. After-hours emergency: call us directly.